Getting the Numbers Right Before Investing: What SMEs Should Prepare in October
The beginning of October presents small and medium-sized enterprises with several interconnected tasks. They need to assess how changing prices affect their orders, prepare well-founded investments and ensure reliable supplies. For manufacturing companies in the Ruse region, these decisions share a common foundation: the quality of the data available to management.
Developments from 28 September to 5 October show that support opportunities are at different stages of preparation. The anticipated industrial programmes worth almost EUR 88 million remain at the post-consultation stage. Under the open “Introduction of Green Technologies in SMEs” procedure, new clarifications draw attention to demonstrating results. At European level, measures to simplify environmental assessments for strategic projects are being prepared, but the legislative process is ongoing.
The practical task for businesses is to use this time to prepare: to identify where losses occur, what an investment could improve, and which resources and partners will be needed to implement it. This allows the decision to apply for funding to be based on a real need and verifiable expectations.
Price Signals Call for a Review of Each Enterprise’s Own Costs
According to the National Statistical Institute (NSI), the total producer price index in industry in August 2026 rose by 3.0% compared with July and by 17.4% year on year. The annual increase in manufacturing was 10.4%, reaching 29.7% for basic metals and 10.6% for chemical products. Differences between sectors remain substantial: general- and special-purpose machinery and equipment recorded an annual decline of 2.0%.
These indicators measure changes in the selling prices of industrial products. The increase of 17.4% does not mean that raw material costs or total costs at every enterprise have risen by that amount. The NSI presents the producer price data and methodology.
The flash estimate of consumer inflation for September is 5.6% year on year and −0.3% month on month. The “Transport” group in the national consumer price index is expected to show a monthly increase of 3.4%. This is a consumer price indicator and does not directly measure freight transport rates. The preliminary data were published by the NSI on 1 October.
Comparing the two indices does not, in itself, demonstrate that business margins are shrinking. They cover different products, markets and reference months. For an individual enterprise, what matters is how its actual purchase prices, selling prices, productivity and product mix have changed.
A suitable first step is to update cost calculations for the main product groups and larger orders still in progress. These calculations should show materials, energy, labour, setup costs, scrap, outsourced services and transport. For orders with long lead times, it is also useful to assess what would happen if a critical material became more expensive or a more costly delivery option had to be used.
For new quotations that are sensitive to material and energy prices, a validity period of 15 to 30 days may be justified, depending on supplier terms and market conditions. For longer contracts, it is sensible to discuss clear adjustment mechanisms: which indicator they are linked to, when they apply and how the customer is notified. Changes must be agreed rather than assumed to be automatically available under contracts already signed.
Payments are the other side of this assessment. In September, the overall business climate indicator fell from 16.6% to 15.3%, while the indicator for industry improved to 16.9%. In construction, the decline was 4.7 points, and the survey recorded more customers with delayed payments. The NSI publishes the sectoral findings of its business trends survey.
For suppliers to the construction sector, this is a reason to review the ageing of receivables, credit limits and advance payment terms. The sectoral signal should be assessed alongside the behaviour of each customer and their performance under existing contracts.
Preparation for an Industrial Partnership Can Begin Now
As of October 5, procedure BG16RFPR002-1.012 "Cooperation Programs for Innovation and Transfer of Knowledge and Technology" is presented in the UNIMIS as public consultation closed. The indicated indicative date of September 30 is not equivalent to the opening of admissions. The verified page of the ministry also contains the draft for discussion. Therefore, it should not be communicated on this date that the application has begun. The current record in the UMIS shows the status of the discussion.
The published draft framework provides for a budget of EUR 87.94 million and maximum aid of approximately EUR 15.34 million per project. The partnership is expected to include a research or academic organisation and at least three SMEs. Up to EUR 30,000 is envisaged for developing a concept, at an aid intensity of 100% under the de minimis regime. For implementation of the industrial programmes, the stated aid intensity is between 50% and 65%, depending on the type of aid and the region. These are draft parameters that must be checked against the final conditions when the procedure opens. The ministry presents the planned structure of the support.
For enterprises, the most useful outcome of preliminary discussions would be a brief description of a shared technological problem. It should explain how the problem manifests itself in the individual companies, what scientific or engineering contribution is needed, and how improvement will be measured.
A possible starting point for discussions between manufacturing enterprises is a recurring problem with quality control, the use of residual materials or the traceability of production parameters. The specific idea must be checked against the objectives and eligible activities of the forthcoming procedure. A joint equipment purchase does not, in itself, explain why a long-term partnership with a research organisation is needed.
Even at this stage, it is useful for partners to clarify who will manage the work, how shared assets will be used, who will hold rights to the results, and how their own financial contributions will be secured. Maintenance costs after the funding period also need to be discussed. For the Ruse region, a natural opportunity would be an initial discussion between interested enterprises, the University of Ruse and suitable technology organisations.
A Green Investment Must Deliver a Demonstrable Result
Under the procedure "Introduction of green technologies in SMEs" the admission is open until 10 November 2026, at 16:30 The total budget is EUR 82.995 million and the aid per individual project is from EUR 77,000 to EUR 450,000 with a maximum intensity of up to EUR 701,000. The specific limits depend on the category of enterprise and the aid scheme chosen. The official page contains the conditions and explanations of the procedure.
The clarifications published on 28 September specify that models aimed at reducing waste or raw material inputs per unit of output require a quantitative result. The data must allow a comparison before and after the investment and be verifiable through relevant documents. For other circular models, the type of result depends on their specific characteristics. The clarifications for questions 151–162 distinguish between these cases.
In practice, this means that the enterprise must define exactly what it is measuring, for which product or process, and over what representative period. If lower material consumption is promised, it must be clear how material inputs, conforming output, scrap and residual materials are recorded. The comparison must use comparable products and a consistent method.
For example, in a hypothetical production process, producing 1,000 conforming items requires 1,200 kg of material. The baseline is 1.20 kg per item. If, after the investment, the same number of comparable items requires 1,100 kg, the indicator falls to 1.10 kg, a reduction of approximately 8.3%. This is an illustrative calculation, not a regulatory threshold. The actual project must substantiate its own figures and supporting evidence.
Sound preparation includes four interconnected elements:
- Baseline. An indicator, period and documents explaining current consumption or waste generation.
- Improvement mechanism. The specific process change through which the equipment or technology will deliver the result.
- Monitoring method. The measurement approach, frequency and person responsible for the data.
- Documentary evidence. Production reports, inventory records, accounting documents and technical measurements, according to the applicable requirements.
The clarifications of 1 October allow a single asset to introduce more than one circular model, but require its contribution and the expected result to be described. Where support is requested for a new activity using residual raw materials or waste from the applicant’s existing activity, their origin must be verifiable through documents.
A separate check is required for regional investment aid for diversification. In this case, eligible costs under Component I must exceed the book value of the reused assets, as recorded in the financial year before work on the project begins, by at least 200%. This means at least three times that value and applies to the specific investment category. The details are provided in the clarifications for questions 163–171.
Questions to the Managing Authority must be submitted through EUMIS no later than three weeks before the deadline. Under the current timetable, this corresponds to 20 October. Enterprises with uncertainties about eligibility or how to demonstrate results should formulate their questions now to allow time for adjustments to the project.
Danube Logistics Must Be Included in Order Costing
On 5 October, the Executive Agency for Exploration and Maintenance of the Danube River reported a water level of −125 cm at Ruse, a decline of 4 cm over the previous day. The agency published information on reduced fairway dimensions between river kilometres 374.10 and 610.00, including measurements taken on 1 October in sections near Batin and Vardim. Current water levels and critical sections are available on the agency’s website.
These data do not announce a general suspension of navigation. They give shippers a reason to confirm the permitted load, route and expected delivery time with the carrier for each specific shipment. Navigation conditions should be checked daily, as a snapshot can quickly become outdated.
For an enterprise, logistics risk can take the form of split shipments, additional transshipment, delayed receipt of materials or the use of more expensive transport. A contingency route therefore needs an advance assessment of cost, available capacity and the time required to arrange it.
When comparing river, road and rail options, it is useful to include handling, storage and additional inventory financing costs. For a critical material, a higher transport cost may be justified if it prevents a production stoppage. The decision nevertheless requires an assessment of the specific order and contractual commitments to the customer.
Faster Environmental Assessments Remain a Legislative Prospect
On 30 September, the Council of the EU adopted a negotiating position on a proposal to accelerate and simplify environmental assessments. The proposal provides for single points of contact, digitalisation and clearer management of timelines. The position covers certain strategic projects and aligns provisions related to the Net-Zero Industry Act, the European Chips Act and the Critical Raw Materials Act.
This is a position for forthcoming negotiations, not legislation that has been finally adopted. The Council states that negotiations with the European Parliament will begin once Parliament has adopted its position. The official announcement explains the scope and next steps.
For enterprises considering investments in the relevant technology areas, useful preparation means identifying the necessary assessments, permits, infrastructure conditions and dependencies between them. Belonging to a particular sector does not, in itself, guarantee that a specific project will benefit from an accelerated procedure. Investment schedules must be based on the rules currently in force until the final scope and application of the changes become clear.
What Can Be Prepared During October
The coming weeks can be used to produce several concrete management outcomes:
- Updated cost calculations for orders exposed to cost changes. Compare quoted and actual costs, check the validity period of new quotations and assess the impact of delayed payments.
- A readiness check for “Green Technologies”. Clarify the applicable circular model, baseline values, expected results and documents. Prepare questions on unclear points in good time, taking account of both the clarification deadline and the application deadline.
- A brief concept for a technology partnership. Describe the shared problem, potential participants, measurable results and required own financial contribution. Check the concept against the final conditions when they are published.
- A confirmed contingency option for critical supplies. Check with carriers the options, cost and lead time for switching to alternative transport. Define the delay or restriction that would trigger this option.
- A realistic investment schedule. Include preparation, permits, delivery, implementation and the time needed to achieve the first measurable result. Also consider a scenario involving delayed funding or lower utilisation of the new asset.
The shared benefit of these actions is a stronger connection between operational data and investment decisions. Information on materials and scrap serves both order costing and the justification of resource efficiency. Delivery data support decisions on inventory and transport. A clearly defined technological difficulty gives substance to discussions with a research partner.
The Ruse Chamber of Commerce and Industry publishes analyses of this kind to help enterprises assess the business environment and prepare for development. Feedback from companies on shared technological needs can provide a basis for targeted contacts with research and expert organisations and for future partnership initiatives.